Stage 1 vs Stage 2

Not sure which stage is right for you? Here's everything you need to know about the differences between Stage 1 and Stage 2 remaps.

Stage 1

Software Only

No hardware changes required

Power Gains

50-200+ BHP

Depends on vehicle and platform

What's Included

  • ✓ Bespoke ECU remap
  • ✓ TCU gearbox tune
  • ✓ Before & after dyno testing
  • ✓ Mild crackle/overrun (where applicable)
  • ✓ Free adjustments for life

Turnaround

4-6 hours (same day)

Price Range

£1,750 - £1,995

Who Is It For?

Perfect if you want significant power gains with zero hardware changes. Drop your car off in the morning, collect it in the afternoon with 50-200+ extra BHP.

Stage 2

Software + Hardware

Supporting modifications required

Power Gains

100-350+ BHP

Significantly more than Stage 1

What's Included

  • ✓ Everything in Stage 1, plus:
  • ✓ PT Custom Downpipes (lifetime warranty)
  • ✓ Modal Works intake / BMC filters
  • ✓ Full service
  • ✓ Pops, bangs & flames
  • ✓ Optional: CPC upgrade (+£1,800)

Turnaround

2-4 days

Price Range

£3,300 - £6,000+

Who Is It For?

For those who want maximum performance. Includes hardware upgrades (downpipes, intake) plus aggressive tuning with pops, bangs, and flames. The full experience.

Real Example: C63 AMG W205

Stage 1

Stock 503BHP → ~600BHP

Price: £1,750

Time: 4-6 hours

+97BHP gain, same day, no hardware needed.

Stage 2

Stock 503BHP → 640-660BHP

Price: From £3,300

Time: 2-4 days

+157BHP gain, includes downpipes, intake, pops & bangs.

Common Questions

Can I start with Stage 1 and upgrade to Stage 2 later?

Absolutely. Many customers start with Stage 1 and come back for Stage 2 when they're ready. Your Stage 1 tune is simply replaced with the Stage 2 calibration.

Is Stage 2 safe?

Yes. Stage 2 includes supporting hardware (downpipes, intake) that allows the engine to breathe properly at higher power levels. We check every log to ensure safe operation.

What about Stage 3?

Stage 3 involves major hardware upgrades like hybrid turbos. It's a custom build taking 7-10 days. Contact us for a bespoke quote.

Ready to choose?

Not sure which stage is right for you? Get in touch and we'll advise.

🚀 Get a Quote